Using the pink that was intended fro the front room as a base coat, we spent a few days painting. This was not a easy task since this section is roughly 100 feet long and 50 feet wide. It took almost a dozen buckets of paint to cover it all.
The wall on the left will be our movie wall where we shall be showing movies once a month for free to the public while the concession stand will be on the wall shown in the right hand picture.
Remember the newly constructed wall, well on the left hand side, you can see how it looks now, fully painted and ready to go. The wall in the right picture is the nearly completed cafe room.